Costa del Sol Renovations editorial team · Updated 13 November 2026 · 2 min read
Request the product references and confirmation that the complete assembly suits the intended use. The appropriate professional should define checks and testing for the project. Keep labelled photographs of concealed details. This is an owner’s briefing checklist, not a substitute for technical design or installation instructions.
Three decisions to get right
- Identify every junction, penetration and drainage connection.
- Specify compatible waterproofing products and installation details.
- Record inspection before membranes are covered.
Explore the wider picture
Choosing materials and finishes
Continue with your project
Make it specific to your villa
Planning guidance. Final specifications, permissions, costs and timescales depend on a property survey and the agreed scope.