Choosing the right approach
The arrival sequence should work for residents, visitors, deliveries and maintenance. Study vehicle movement, pedestrian routes, sightlines and lighting before choosing gates or paving. Ground levels and drainage need to support that layout. Coordinate any powered gate with the appropriate installer, including operation and maintenance provisions, and keep service access from conflicting with the main entrance.
What the specification should cover
- Vehicle and pedestrian routes
- Gate and entry positions
- Paving levels and drainage
- Arrival lighting
- Installer coordination and servicing
Questions about driveways, gates & entrances
What should be decided before a new entrance gate is ordered?
Confirm openings, vehicle movement, ground levels, service access and the chosen operating system. The installer should review the actual setting and relevant requirements before gate dimensions and automation are finalised.
Plan this work for your location
Use the local planning brief to discuss access, the existing property and coordination before a quotation.
