What should a renovation quotation include?
A comparable quotation identifies the same rooms, drawings, materials and quantities, then distinguishes fixed work, allowances and exclusions. Compare the full installed result, not just a price per square metre. Keep unresolved survey items visible before agreeing the final scope.
| Quotation item | What to specify | What to ask |
|---|---|---|
| Preparation | Protection, strip-out, access and waste handling. | Are making good and final cleaning included? |
| Building and installations | Measured scope, drawing version and connections to retained work. | Which existing conditions require investigation? |
| Finishes and allowances | Product reference, quantity, installed price and allowance basis. | How is a different selection priced before ordering? |
| Costs outside the works | Applicable taxes, technical fees and permissions, stated separately. | Which amounts are included, excluded or still to be confirmed? |
Start with the existing property
Collect available plans, photographs and details of earlier alterations. A measured survey should check the dimensions that affect kitchens, glazing and built-in furniture. The inspection is also the moment to identify which conditions remain uncertain and which specialist assessments are needed. Resolve those questions before treating a budget as fixed.
Compare the same scope
A useful quotation separates preparation, construction, installations, finishes and external work. Ask which drawings and product specifications it follows, which items are allowances, and what is excluded. Professional fees, permissions, taxes and waste handling should be discussed explicitly. A lower total is not necessarily better value when the underlying work differs.
Build a decision schedule
The programme needs more than a start and finish date. Note when layouts, samples and long-lead items must be approved, who approves them and what happens if a selection changes. Link payment milestones to an agreed contract and demonstrable progress. Keep a separate allowance for genuinely unknown conditions rather than quietly absorbing them into decorative choices.
Your planning checklist
- Current drawings and measured dimensions
- Written scope and exclusions
- Permissions and technical responsibilities
- Material decisions and delivery dates
- Change approvals and handover requirements
Planning guidance. Final specifications, permissions, costs and timescales depend on a property survey and the agreed scope.